Family Owned · CA Lic. #1086910 · Free Consultations

Sacramento · PlacerTear-down & rebuild across Sacramento & Placer County

Tear Down and Rebuild Your House in Sacramento

Keep the street, the school and the lot you already own, and replace the house on it. GVD Builders & Construction handles the whole job under one contract: demolition permits, hazardous-material checks, utility shut-offs, design, new permits and construction of the new home.

Rated 5.0/5 on Google
  • CA License #1086910
  • Based in Roseville
  • Free consultation call
Tear-down & rebuild
Talk through your rebuild

Send the address and a few words about the house. We’ll call to talk it through and give you a ballpark range at no cost.

Free consultation, no pressure

At a glance

Sacramento tear-down and rebuild contractor at a glance

What it is
Taking an existing house down to bare ground and building a new home on the same lot, with new foundation, framing and systems.
Who builds it
GVD Builders & Construction, a family-run, California-licensed general contractor (CSLB #1086910) based in Roseville.
Where
Sacramento, Roseville and the communities of Sacramento, Placer and El Dorado counties.
Planning cost
Our sample budgets start at $686k to $1M for a 2,200 sq ft single-story, demolition included. Land and financing are extra.
Typical timeline
Usually 14 to 22 months from the first call to move-in. About half of that is design and permits.
Tools on this page
A rebuild cost calculator and sample budgets you can use without giving your details.
An older single-story house of the kind often replaced in a rebuildCarpenter cutting framing lumber on a job siteModern new home with large windows

Rebuild or remodel?

Tear down and rebuild or remodel? How to decide

A rebuild is not always the answer. We price both when it is close, and the points below are the ones that usually decide it.

QuestionRebuild when…Remodel when…
FoundationIt is cracked, settling or would have to be replaced to carry a second story.It is level, sound and can carry the new loads with modest work.
LayoutThe plan you want moves most walls or raises the ceilings.The rooms you want fit inside the walls and roofline you have.
SystemsWiring, plumbing, ducts and the sewer lateral are all near the end of their life.Only one or two systems need replacing.
SizeYou want a much larger home or a full second story.You need one or two more rooms.
Energy and comfortYou want the whole house built to the current California Energy Code.Insulation, windows and a heat pump get you most of the way.
Cost certaintyYou want a firm price with few unknowns once work starts.You can hold a reserve for what turns up inside old walls.
Historic statusThe house is not a historic resource.It is listed, or likely eligible, which can stop a demolition.

Signs your house is worth tearing down

  • Cracks, sloping floors or doors that stick from a settling foundation.
  • Original wiring, a small electrical panel and galvanized water pipes, all at once.
  • Termite or dry-rot damage in the framing, not just the trim.
  • Low ceilings and a closed-in plan that no remodel can open up.
  • A house much smaller than the zoning lets the lot carry.
  • Remodel quotes that keep climbing as each problem is found.

Is it cheaper to tear down and rebuild?

When a remodel quote for most of the house climbs past roughly two-thirds of what a new home would cost, we suggest pricing a rebuild side by side. Past that point you are paying new-home money for old bones, and the old bones still set the ceiling heights, the layout and what is hiding in the walls.

If the frame and foundation are sound and you mostly want more room, an addition or a second story is usually the better spend, and we will tell you so.

Tear-down and rebuild cost

Cost to tear down and rebuild a house in Sacramento

Demolition, haul-off and new utility connections are built into every figure below, so the totals are for the whole job, not just the new house. The sample budgets use the same numbers as the calculator.

  • Replace a 1950s ranch with a 2,200 sq ft single-storyStandard finishes, flat lot, utilities at the street.$686k – $1M$312 – $456 / sq ft
  • Two-story, 2,800 sq ft with garageUpgraded finishes, attached garage, new sewer lateral.$995k – $1.5M$355 – $537 / sq ft
  • Two-story, 2,800 sq ft plus a backyard ADUUpgraded finishes, garage, and a detached ADU built in the same project.$1.18M – $1.85M$423 – $660 / sq ft

Example ranges for reference only, not estimates or quotes. Real pricing depends on an in-person visit, measurements, plans and your material selections.

What are you building?
1,0005,000 sq ft
Finish level
Site and scope
For reference only · Not a quote
Ballpark total
$686k – $1M
About $312 to $456 per sq ft, all in
  • Rebuild as one story, 2,200 sq ft (Standard)$594k – $792k
  • Demolition, haul-off and site clearing$22k – $48k
  • Utility disconnects and new service connections$8k – $25k
  • Design, engineering, permits & fees$62k – $138k

For reference only. This calculator is a rough planning tool, not an estimate, bid or quote. Your actual price depends on an in-person site visit, measurements, your plans, material selections, engineering and permit requirements, and can come in higher or lower than shown. Demolition figures assume a typical one- or two-story wood-frame house; the base cost includes the fire sprinklers and rooftop solar California requires on new homes. Land, financing and city connection or impact fees are not included. A firm price comes after pre-construction (site visit, feasibility and a detailed budget) and permit-ready plans.

How pricing works
  1. Step 1 · FreeConsultation call

    Talk through your lot, goals and budget with a builder, and get a ballpark range. No site visit needed yet.

  2. Step 2 · Flat fee, credited to your buildPre-construction

    Site visit, feasibility check (zoning, setbacks, utilities), preliminary design or a review of your plans, and a detailed budget.

  3. Step 3 · Fixed pricePlans, permits and build

    With engineered, permit-ready plans, from us or your own architect, you get a firm construction price. We pull permits and build.

One contract

House demolition and rebuild, under one contract

Most of the risk in a rebuild sits in the steps before the new foundation goes in. We run all of them, in order, so nothing stalls while the lot sits empty.

Feasibility and lot check

Zoning, setbacks, height limits, easements, trees, utility locations and the age of the house, checked before you spend money on design.

Historic and permit review

Older houses can need a historic review before a demolition permit is issued. We file it early and run it alongside design.

Asbestos and lead testing

We test any house old enough to contain asbestos or lead paint and use licensed abatement crews where it is found.

Utility shut-offs

Gas and electric removal with PG&E, SMUD or Roseville Electric, plus water and sewer sign-offs, requested weeks ahead so they don’t hold up demolition.

Demolition and recycling

A waste management plan, sorted debris and recycling records, as local construction and demolition rules require.

The new home, start to finish

Design with our partner architects and engineers, permits, construction and final inspection under one contract.

How it runs

The tear-down and rebuild process, step by step

  1. Step 1 · This week

    Free consultation call

    Tell us about the house, the lot and what you want to build. You get an honest view of rebuild versus remodel and a ballpark range.

  2. Step 2 · 2 to 4 weeks

    Pre-construction

    Site visit, feasibility check, survey and soils as needed, the house’s age and historic status, and a detailed budget. A flat fee, credited to your build.

  3. Step 3 · 2 to 4 months

    Design and engineering

    Plans with our partner architects and engineers, or yours, priced as they develop so the design stays inside the budget.

  4. Step 4 · 2 to 4 months

    Permits

    Demolition and building permits filed together, with utility removal requested at the same time. You get a fixed construction price on the permit-ready plans.

  5. Step 5 · 2 to 4 weeks

    Demolition and site work

    Testing and abatement, utility shut-offs, demolition, recycling, then grading and new utility trenches. We schedule demolition for when the building permit is ready, so the lot doesn’t sit empty.

  6. Step 6 · 9 to 12 months

    Construction

    Foundation, framing, roof, systems, insulation and finishes, with regular updates and walk-throughs at the key milestones.

  7. Step 7

    Final inspection and move-in

    Final city sign-off, then a walk-through and punch list closed with you before you move in.

Times are typical ranges for the Sacramento region. Plan review times change with each city’s workload, and we give you a schedule for your lot during pre-construction.

Local rules

Sacramento demolition permits and rebuild rules

These are the rules we plan around on every tear-down. Each one links to the agency that sets it.

City of Sacramento wrecking permit

Demolition needs a wrecking permit with sign-offs from Planning, Fire, Solid Waste and the Department of Utilities. Houses 50 or more years old also need a demolition investigation, with up to 45 days of historic review once the application is complete.

Source: City of Sacramento, Application for Wrecking Permit (CDD-0233)

Waste plans and recycling

Sacramento County, Placer County and Roseville require an approved construction and demolition waste plan before a demolition permit is issued. California’s green building code sets a 65% diversion target.

Source: Placer County, Construction and Demolition Diversion

Asbestos

Air-district asbestos notification rules mostly cover larger buildings, not homes of four units or fewer, but disposal rules still apply. Roseville asks for an asbestos declaration on every demolition. We test before any older house comes down.

Source: Placer County APCD, Construction Asbestos Fact Sheet

Lead

Cal/OSHA’s lead standard covers demolition of structures where lead is present, so crews follow lead-safe work and disposal rules on older houses.

Source: Cal/OSHA lead standard, 8 CCR 1532.1

Gas and electric removal

PG&E gas service is removed through its online project portal, and its review can take several weeks. Roseville homes are served by Roseville Electric, much of Sacramento County by SMUD.

Source: PG&E, residential building and renovation projects

2025 California Energy Code

In effect since January 1, 2026. New homes need rooftop solar, and the standard design path uses heat pumps for heating and hot water.

Source: California Energy Commission, What’s New for 2025 (single-family)

All-electric rules

Sacramento adopted an all-electric rule for new low-rise buildings in 2023 and later suspended enforcement after a federal court ruling. We confirm the current rule for your address at permit time.

Source: City of Sacramento, New Construction Electrification

Fire sprinklers

California requires fire sprinklers in all new one- and two-family homes. A full rebuild counts as a new home, so sprinklers are in every rebuild budget we give you.

Source: State Fire Marshal and HCD, Information Bulletin on residential sprinklers

Wildfire zones

In mapped fire hazard zones, common in the Placer and El Dorado foothills, new homes follow California’s wildland-urban interface building rules for roofs, vents, siding and windows.

Source: CAL FIRE / OSFM, Building in the wildland

Property tax

The new house is assessed at its market value when finished. The old house’s assessed value is removed, and the land keeps its existing base value.

Source: California BOE, Property Tax Rule 463

School impact fees

School districts may charge up to $5.38 per sq ft of new home in 2026. Whether you get credit for the house you demolish depends on the district.

Source: State Allocation Board, 2026 developer fee adjustment

An ADU in the same project

State law lets you apply for an ADU along with the new house. ADUs of 750 sq ft or less pay no impact fees, though connection fees can still apply when built with a new home.

Source: Cal. Gov. Code § 66311.5

We build across Sacramento, Placer and El Dorado counties. See the full list of cities we serve.

FAQ

Tear down and rebuild FAQs

How much does it cost to tear down and rebuild a house in Sacramento?

Our planning range for a 2,200 sq ft single-story with standard finishes is $686k to $1M, and a 2,800 sq ft two-story with upgraded finishes and a garage runs $995k to $1.5M. Both include demolition, haul-off, utility work, design, engineering and permits. Land, financing and moving costs are not included. Use the calculator on this page for your own size and finish level.

How much does it cost to demolish a house in Sacramento?

For a typical one- or two-story wood-frame house, demolition, haul-off and site clearing runs about $22,000 to $48,000 in our planning ranges, plus $8,000 to $25,000 for utility disconnects and new service connections. Asbestos or lead abatement, a basement, a pool or protected trees add to that, and permit and waste-plan fees vary by city. These are reference figures, not a quote.

Is it cheaper to remodel or to tear down and rebuild?

A light or medium remodel almost always costs less. Once a remodel reaches most of the house, with a new foundation, new systems and moved walls, the gap narrows. When a remodel quote passes about two-thirds of the cost of a new home, we suggest pricing both, because the new home comes with fewer unknowns and is built to the current code.

How long does a tear-down and rebuild take?

Plan on 14 to 22 months from the first call to move-in. Design usually takes two to four months, permits another two to four, demolition a few weeks and construction about nine to twelve months. Nationally, contractor-built homes took about 10.5 months from start to completion in 2025.

Do I need a permit to demolish my house?

Yes. In the City of Sacramento it is a wrecking permit, with sign-offs from Planning, Fire, Solid Waste and Utilities, and a historic review for houses 50 or more years old. The counties and Roseville have their own permits and require a construction and demolition waste plan. We prepare and file all of it.

Do you test for asbestos before demolition?

Yes, on any house old enough to contain it. Air-district notification rules mostly target larger buildings, but asbestos and lead still have to be handled and disposed of safely, and some cities ask for a declaration with the permit. Where testing finds either, licensed abatement crews remove it before demolition.

Will my property taxes go up after a rebuild?

Usually, yes. Under California rules the new house is assessed at its market value once finished, the old house’s value is removed, and the land keeps its current assessed value. Ask your county assessor for an estimate for your property.

Can I add an ADU when I rebuild?

Yes. State law allows an ADU on a lot with a proposed home, and you can apply for both together. Building them in one project shares the demolition, site work and utility trenches, which usually costs less than building the ADU later.

Do you charge for a site visit?

The first call and a ballpark range are free. The site visit, feasibility check and detailed budget are part of our pre-construction service, a flat fee credited toward your build if you go ahead with us. Firm pricing comes once the plans are permit-ready.

Can I use my own architect?

Yes. We build from your architect’s plans, or design with our partner architects and engineers. Either way we price the design as it develops so the plans match the budget.

How do people pay for a rebuild?

Most use a construction loan: either construction-to-permanent, which turns into a regular mortgage when the home is finished, or a short construction-only loan refinanced later. Lenders pay us in draws as work is completed. We work with your lender’s draw schedule and inspections.

Sources: City of Sacramento, Application for Wrecking Permit (CDD-0233); California BOE, New Construction; U.S. Census Bureau, length of time to build; CFPB, construction loan guide; Fannie Mae, construction-to-permanent financing. Page last updated .

Start your rebuild with a free call

Send us the address. We will look at the lot, the zoning and the house on it, and tell you honestly whether rebuilding makes sense.

Areas Served