
Sacramento New Construction & Home Builders
Homes, ADUs, additions, small apartment buildings and tenant build-outs, built from the ground up by one licensed general contractor. We price the work as it is designed, so the plans you take to the city match the budget you set.
Prefer the phone? Call (916) 318-5192
- CA License #1086910
- Based in Roseville
- Free consultation call
Share the address and a few words about the project. We’ll call to talk it through and give you a ballpark range at no cost.
What we build
New construction services in Sacramento
Pick the closest match. Each page has the details, the local rules and, for most, a cost calculator.
Custom HomesA new home designed for your lot and the way you live.Learn more
Tear Down & RebuildReplace an aging house with a new one on the lot you already own.Learn more
ADUsDetached, attached and garage-conversion units, permits included.Learn more
Home AdditionsSecond stories and new rooms that look like they were always there.Learn more
Multifamily ConstructionDuplexes, fourplexes, townhomes and small apartment buildings.Learn more
Spec & Investor BuildsHomes built to sell or rent, priced from the drawings.Learn more
Commercial Build-OutsOffice and retail tenant improvements, scheduled to your opening date.Learn more
Design-BuildPlans by licensed partner architects and engineers, priced as they are drawn.Learn more At a glance
Sacramento new home builders at a glance
- Who builds it
- GVD Builders & Construction, a family-run, California-licensed general contractor (CSLB #1086910) based in Roseville.
- Where
- Sacramento, Roseville and the cities of Sacramento, Placer and El Dorado counties.
- How pricing works
- A free consultation call and ballpark, then paid pre-construction credited to your build, then a fixed price on permit-ready plans.
- Design
- Our partner architects and engineers, or your own. Either way we check cost as the plans develop.
- Typical timeline
- A new home usually takes 12 to 20 months from first call to move-in, about half of it design and permits.
- Tools
- Free cost calculators for custom homes, tear-downs, ADUs, additions, multifamily and commercial build-outs.



- Step 1 · FreeConsultation call
Talk through your lot, goals and budget with a builder, and get a ballpark range. No site visit needed yet.
- Step 2 · Flat fee, credited to your buildPre-construction
Site visit, feasibility check (zoning, setbacks, utilities), preliminary design or a review of your plans, and a detailed budget.
- Step 3 · Fixed pricePlans, permits and build
With engineered, permit-ready plans, from us or your own architect, you get a firm construction price. We pull permits and build.
Planning ranges
Cost to build a house in Sacramento, per square foot
Construction cost per square foot, from standard to premium finishes. Design, engineering, permits, city fees and land are on top. Each calculator adds those for you.
| Project | Construction cost | Calculator |
|---|---|---|
| Single-story custom home | $270 to $486 per sq ft | Custom home calculator |
| Two-story custom home | $255 to $466 per sq ft | Custom home calculator |
| Tear down and rebuild | $270 to $486 per sq ft, plus demolition | Rebuild calculator |
| Detached ADU | $300 to $540 per sq ft | ADU calculator |
| Ground-floor addition | $300 to $574 per sq ft | Addition calculator |
| Duplex to fourplex | $240 to $439 per sq ft | Multifamily calculator |
| Office build-out | $90 to $216 per sq ft | Build-out calculator |
How it runs
How new home construction works, from lot to keys
- Step 1 · This week
Free consultation call
Your lot, your goals and your budget, with an honest ballpark and a view on what the lot can carry.
- Step 2 · 2 to 4 weeks
Pre-construction
Site visit, zoning and setback check, utility locations, survey and soils as needed, and a detailed budget. A flat fee, credited to your build.
- Step 3 · 2 to 4 months
Design and engineering
Plans, structural engineering and energy calculations, priced at each stage so the design stays on budget.
- Step 4 · 1 to 4 months
Permits and fixed price
We submit, answer plan-check comments and give you a fixed construction price on the approved plans.
- Step 5 · 6 to 12 months
Construction
Site work, foundation, framing, systems and finishes, with inspections at each stage and regular updates.
- Step 6
Final and handover
Final city sign-off, a walk-through and a closed punch list before you move in.
Times are typical ranges for the Sacramento region and vary by city, project size and plan-check workload.
Before the first call
What to have ready before you build
- The address or parcel number (APN).
- A rough size: square feet, bedrooms, stories or units.
- Any survey, plans or sketches you already have.
- A budget range, even a loose one.
- When you want to start, and any hard deadlines.
- How you plan to pay: cash, construction loan or investor funds.

California rules
California building rules for new homes in 2026
2025 Energy Code
In effect since January 1, 2026. New homes need rooftop solar, and the standard design path uses heat pumps for heating and hot water.
Source: California Energy Commission, What’s New for 2025 (single-family)Fire sprinklers
Required in every new one- and two-family home in California, so we include them in every new-home budget.
Source: State Fire Marshal and HCD, Information Bulletin on residential sprinklersWildfire zones
In mapped fire hazard zones, common in the Placer and El Dorado foothills, roofs, vents, siding and windows follow wildland-urban interface rules.
Source: CAL FIRE / OSFM, Building in the wildlandSchool impact fees
School districts may charge up to $5.38 per square foot of new residential space in 2026.
Source: State Allocation Board, 2026 developer fee adjustmentADUs with a new home
You can apply for an ADU together with a new house. ADUs of 750 sq ft or less pay no impact fees.
Source: Cal. Gov. Code § 66311.5Property tax
New construction is assessed at market value when it is finished; the land keeps its existing assessed value.
Source: California BOE, New ConstructionFAQ
New construction FAQs
How much does it cost to build a house in Sacramento?
For a single-story custom home, construction runs about $270 to $486 per sq ft depending on finishes, before design, permits, city fees and land. Hillside lots, long utility runs and rural well and septic systems add to that. Our calculators show the full ballpark for your size and finish level.
How long does it take to build a new home?
Usually 12 to 20 months from the first call to move-in: two to four months of design, one to four months of permits and plan check, and six to twelve months of construction depending on size.
Do you give free estimates for new construction?
The first call and a ballpark range are free. The site visit, feasibility check and detailed budget are part of pre-construction, a flat fee credited toward your build. Firm pricing comes with permit-ready plans.
Do I need an architect?
Most new homes are drawn by an architect or a building designer, with a structural engineer. We design with licensed partner architects and engineers, or build from your own plans.
Can you build on a lot I already own outside Sacramento?
Yes, anywhere in Sacramento, Placer and El Dorado counties and nearby. Rural lots often need a well, septic system or a long utility run, and we price those during pre-construction.
Do you build multifamily and commercial projects too?
Yes. We build duplexes, fourplexes, townhomes and apartment buildings up to about 20 units, and we do office and retail tenant build-outs.
Sources: California Energy Commission, What’s New for 2025 (single-family); State Fire Marshal and HCD, Information Bulletin on residential sprinklers; State Allocation Board, 2026 developer fee adjustment. Page last updated .
Have a lot or a plan? Start with a free call
Send us the address and what you want to build. We will tell you what the lot can carry and what it is likely to cost.