Family Owned · CA Lic. #1086910 · Free Consultations

Sacramento · RosevilleOffice & retail tenant improvements, Sacramento & Placer County

Tenant Improvement Contractor in Sacramento: Office & Retail Build-Outs

GVD Builders & Construction turns shells and dated suites into finished offices and shops. We plan the job backward from the day you open or your lease starts, and manage the trades, the inspections and the landlord’s requirements along the way.

Rated 5.0/5 on Google
  • CA License #1086910
  • Based in Roseville
  • Free consultation call
Commercial build-out
Tell us your opening date

Share the address, the suite size and when you need to open. We’ll call to talk it through and give you a ballpark range at no cost.

Free consultation, no pressure

At a glance

Sacramento tenant improvements at a glance

What we build
Office and retail tenant improvements, from second-generation refreshes to full build-outs from a shell.
Who builds it
GVD Builders & Construction, a California-licensed general contractor (CSLB #1086910) based in Roseville.
Where
Sacramento, Roseville, Rocklin, Folsom and the surrounding cities of Sacramento and Placer counties.
Planning cost
A 4,000 sq ft office build-out with upgraded finishes runs about $516k to $1.02M, design and permits included.
Who we work with
Business owners, tenants, landlords and property managers, and their architects or space planners.
Tools on this page
A build-out cost calculator and sample budgets, with no contact details needed.

What we build

Office build-outs and retail tenant improvements

Office build-outs

Open work areas, private offices, conference and break rooms, built to your layout and the building’s standards.

  • Demising and interior walls
  • Ceilings, lighting and controls
  • HVAC zoning and data wiring
  • Accessible restrooms and break rooms

Retail build-outs

Sales floors and back-of-house space that match your brand guidelines and the landlord’s criteria.

  • Storefront glass and entries
  • Fitting rooms and stockrooms
  • Display lighting and power
  • Finishes from your brand package

Second-generation refreshes

Updating a previous tenant’s space with new finishes and a few layout changes, often the fastest way to open.

  • Paint, flooring and lighting
  • Minor wall and door changes
  • Restroom accessibility updates
  • Work at night or on weekends

Landlord work

Vanilla-shell and spec-suite improvements that help owners lease space faster.

  • Warm and vanilla shells
  • Common restroom upgrades
  • Spec suites ready to lease
  • Repeatable finish standards
Newly built-out office suite with polished concrete floorRetail store interior with shelving and display lightingOffice with glass walls and a conference table

Build-out cost

Tenant improvement cost per square foot

Sample budgets first, then the calculator. Choose the type of space, its size, the finish level and the systems work it needs.

  • Office refresh, 2,500 sq ftPaint, carpet tile, LED lighting and two new walls in a second-generation suite.$95k – $200k$38 – $80 / sq ft
  • Office build-out, 4,000 sq ftPrivate offices, conference and break rooms, HVAC zoning and data wiring.$516k – $1.02M$129 – $254 / sq ft
  • Retail build-out, 1,800 sq ftSales floor, fitting rooms, accessible restroom and a new storefront.$238k – $531k$132 – $295 / sq ft

Example ranges for reference only, not estimates or quotes. Real pricing depends on an in-person visit, measurements, plans and your material selections.

What are you building?
50015,000 sq ft
Finish level
Site and scope
For reference only · Not a quote
Ballpark total
$95k – $200k
About $38 to $80 per sq ft, all in
  • Second-generation refresh, 2,500 sq ft (Standard)$88k – $175k
  • Design, permits & project management$7k – $25k

For reference only. This calculator is a rough planning tool, not an estimate, bid or quote. Your actual price depends on a walk-through of the space, measurements, your plans, the condition of existing systems, material selections and permit requirements, and can come in higher or lower than shown. Any tenant-improvement allowance from your landlord is not deducted. Your price comes after a site walk and a review of your plans and lease work letter.

How it runs

The commercial build-out process, scheduled to your opening day

  1. Step 1 · This week

    Free consultation call

    Your space, your lease dates and your opening day, with a ballpark range for the work.

  2. Step 2 · 1 to 2 weeks

    Site walk and scope

    We walk the suite, review the lease work letter and the landlord’s requirements, and check existing systems.

  3. Step 3 · 3 to 8 weeks

    Plans and pricing

    Plans by your architect or ours, priced as they develop, with long-lead items ordered early.

  4. Step 4 · 2 to 8 weeks

    Permits

    Building plan check, plus fire review where sprinklers or alarms change. We answer comments and keep the schedule moving.

  5. Step 5 · 4 to 12 weeks

    Construction

    Framing, systems, ceilings and finishes, scheduled around the building’s rules and other tenants.

  6. Step 6

    Inspections and opening

    Final inspections, a punch list closed with you, and the documents your landlord and insurer ask for.

Times depend on the size of the space, the city’s plan-check workload and lead times for items like storefront glass and HVAC equipment.

California rules

California TI rules: accessibility, CASp, energy and permits

Accessibility path of travel

When you alter a space, part of the budget must improve the accessible route, entrance, restrooms and parking serving it: up to 20% of construction cost on projects up to $209,208 in 2026, and full compliance above that unless a hardship is approved.

Source: DSA, 2026 valuation threshold

CASp disclosure in leases

California commercial leases must say whether the premises have been inspected by a Certified Access Specialist (CASp). Many tenants ask for an inspection before they build.

Source: California Commission on Disability Access, FAQs

Lighting alterations

Replacing or altering 10% or more of the light fixtures in a space brings that lighting under the Energy Code, which usually means LED fixtures and controls.

Source: Energy Code Ace, additions and alterations

Sacramento TI permits

City of Sacramento tenant-improvement plans are submitted electronically, need a stamped plan set and an accessibility path-of-travel form, and include fire sprinkler plans when sprinklers or alarms change.

Source: City of Sacramento, commercial remodel and TI checklist (CDD-0231)

Plan review times

Sacramento targets 15 working days for the first review of commercial alterations under $400,000, and 10 for each later round, for complete submittals.

Source: City of Sacramento, plan review cycle times (CDD-0294)

FAQ

Commercial build-out and TI FAQs

What is a tenant improvement?

A tenant improvement (TI), or build-out, is construction inside a leased commercial space to fit it to the business moving in: walls, ceilings, lighting, HVAC, restrooms, finishes and storefronts. The landlord often pays part of it through a tenant improvement allowance written into the lease.

How much does a tenant improvement cost per square foot in Sacramento?

A second-generation refresh often runs about $35 to $70 per square foot before design and permits, and a full office or retail build-out from a shell about $80 to $160, more with premium finishes, new restrooms or major HVAC work. The calculator on this page shows a ballpark for your space.

How long does an office build-out take?

Most office and retail build-outs take about three to six months from the first call to opening: plans and permits first, then four to twelve weeks of construction depending on size.

Does my build-out need a permit?

Almost always. New walls, electrical, plumbing, HVAC, ceilings and storefronts need a building permit, and changes to fire sprinklers or alarms go through fire review too. We pull and manage them.

Will I have to upgrade accessibility?

Usually some. California requires part of an alteration budget to go toward accessible routes, entrances, restrooms and parking when a space is altered. We price it into the plan so it does not surprise you at plan check.

Can you work with my landlord’s tenant improvement allowance?

Yes. We price the work against the lease work letter, show what the allowance covers, and provide the invoices and lien releases landlords usually ask for.

Do you build restaurants or medical offices?

Our commercial work is office and retail tenant improvements.

Page last updated .

Tell us when you need to open

Send the address, the suite size and your target date. We will tell you whether the date is realistic and what the build-out is likely to cost.

Areas Served