Family Owned · CA Lic. #1086910 · Free Consultations

Sacramento · PlacerDuplexes to 20-unit buildings across the Sacramento region

Multifamily Construction in Sacramento: Duplexes, Fourplexes & Apartments

GVD Builders & Construction builds duplexes, fourplexes, townhomes and apartment buildings of up to 20 units for owners, investors and small developers. We start with what the parcel can legally hold, then design and price a building that pencils.

Rated 5.0/5 on Google
  • CA License #1086910
  • Based in Roseville
  • Free consultation call
Multifamily construction
Tell us about your parcel

Send the address or APN and the number of units you have in mind. We’ll call to talk it through and give you a ballpark range at no cost.

Free consultation, no pressure

At a glance

Sacramento multifamily builder at a glance

What we build
Duplexes and SB 9 projects, triplexes and fourplexes, townhomes and small-lot homes, and walk-up apartment buildings of 5 to 20 units.
Who builds it
GVD Builders & Construction, a California-licensed general contractor (CSLB #1086910) based in Roseville.
Where
Sacramento, Roseville and the cities of Sacramento, Placer and El Dorado counties.
Planning cost
A 4,000 sq ft fourplex with upgraded finishes and site work runs about $1.27M to $2.05M before land and city fees.
Who it is for
Owners adding units to a lot they hold, investors building to rent, and small developers building to sell.
Tools on this page
A multifamily cost calculator and sample budgets, with no contact details needed.

Building types

Duplex, fourplex, townhome and apartment construction

Duplexes and SB 9 projects

Two homes on one lot, or a lot split into two with up to two units on each, where state law allows it.

  • Side-by-side or stacked units
  • Separate meters and entries
  • Often paired with an ADU

Triplexes and fourplexes

The most units you can usually fit on one residential lot without moving into commercial-scale construction.

  • Shared structure, separate units
  • Parking and access planned first
  • Rental or for-sale layouts

Townhomes and small-lot homes

Attached or small detached homes on their own lots, for builders who want to sell units individually.

  • Fire-rated party walls
  • Small-lot subdivision rules
  • Private yards and garages

Apartments, 5 to 20 units

Two- and three-story wood-frame walk-ups, designed for rentable floor plans and efficient structure.

  • Stacked plumbing and repeatable units
  • Fire sprinklers and alarms
  • Accessible ground-floor units
Three-story walk-up apartment building with balconiesModern multifamily building with dark sidingApartment building balconies against the sky

Multifamily construction cost

Cost to build a duplex, fourplex or apartment building

Sample budgets first, then the calculator for your own building. Figures include design, engineering and permits; land and per-unit city fees are extra.

  • Side-by-side duplex, 2,400 sq ftTwo 3-bedroom units, standard finishes, utilities at the street.$660k – $947k$275 – $394 / sq ft
  • Fourplex, 4,000 sq ftFour 2-bedroom units, upgraded finishes, new frontage and utility work.$1.27M – $2.05M$319 – $512 / sq ft
  • 12-unit walk-up, 9,000 sq ftTwo stories, standard finishes, surface parking and utility work.$2.4M – $3.72M$267 – $414 / sq ft

Example ranges for reference only, not estimates or quotes. Real pricing depends on an in-person visit, measurements, plans and your material selections.

What are you building?
1,6005,000 sq ft
Finish level
Site and scope
For reference only · Not a quote
Ballpark total
$660k – $947k
About $275 to $394 per sq ft, all in
  • Duplex or SB 9 two-unit, 2,400 sq ft (Standard)$600k – $816k
  • Design, engineering, permits & fees$60k – $131k

For reference only. This calculator is a rough planning tool, not an estimate, bid or quote. Your actual price depends on an in-person site visit, measurements, your plans, material selections, engineering and permit requirements, and can come in higher or lower than shown. Per-unit water, sewer, park and school fees are not included; we list them for your parcel during pre-construction. Land, financing and city connection or impact fees are not included. A firm price comes after pre-construction (site visit, feasibility and a detailed budget) and permit-ready plans.

How pricing works
  1. Step 1 · FreeConsultation call

    Talk through your lot, goals and budget with a builder, and get a ballpark range. No site visit needed yet.

  2. Step 2 · Flat fee, credited to your buildPre-construction

    Site visit, feasibility check (zoning, setbacks, utilities), preliminary design or a review of your plans, and a detailed budget.

  3. Step 3 · Fixed pricePlans, permits and build

    With engineered, permit-ready plans, from us or your own architect, you get a firm construction price. We pull permits and build.

Feasibility

Multifamily feasibility: what your lot can hold

One wrong assumption about a parcel can wipe out the margin on a small multifamily project. These are the questions we answer in pre-construction.

  • Zoning, density and the number of units the parcel can hold, including state housing laws.
  • Setbacks, height limits, lot coverage and open space.
  • Parking rules, and whether the parcel is near transit, which can remove parking minimums.
  • Water, sewer and power capacity, and whether new mains or a transformer are needed.
  • Frontage work the city may require: curb, gutter, sidewalk and driveway approaches.
  • Per-unit fees for water, sewer, parks, schools and traffic, listed for your parcel.
  • Fire access, hydrant distance and sprinkler requirements.
  • A unit mix and rent or sale assumptions that support the budget.
Two builders in safety vests reviewing a construction site

How it runs

The multifamily construction process

  1. Step 1 · This week

    Free consultation call

    Your parcel, unit count, budget and exit plan, with a ballpark and an honest view of what the site can carry.

  2. Step 2 · 3 to 6 weeks

    Pre-construction and feasibility

    Zoning and density check, utility capacity, fees, a site plan and a detailed budget. A flat fee, credited to your build.

  3. Step 3 · 3 to 6 months

    Design and engineering

    Plans with licensed partner architects and engineers: structural, civil, energy and fire, priced as they develop.

  4. Step 4 · 2 to 6 months

    Entitlements and permits

    Planning review where required, then building permits. You get a fixed construction price on the approved plans.

  5. Step 5 · 9 to 16 months

    Construction

    Site and utility work, foundations, framing, systems and finishes, built unit by unit with inspections at each stage.

  6. Step 6

    Final and occupancy

    Final inspections, utility meters set and a closed punch list for every unit.

Times vary with parcel, unit count and each city’s review workload; projects that qualify for state streamlining can move faster.

California rules

SB 9, small-lot and ADU rules for multifamily in California

SB 9 duplexes and lot splits

In single-family zones, SB 9 allows up to two homes per lot, or a split into two lots with up to two homes each, approved without a hearing. Lot splits need an owner-occupancy affidavit, and SB 9 cannot be used to remove housing rented in the last three years.

Source: HCD, Lot Splits and Duplexes (SB 9)

Small-lot subdivisions

The Starter Home Revitalization Act (SB 684 and SB 1123) allows up to 10 homes on up to 10 small lots on qualifying urban parcels, with approval within 60 days. Vacant single-family lots have qualified since July 1, 2025.

Source: HCD, Starter Home Revitalization Act

ADUs with multifamily

A new multifamily building can include up to two detached ADUs, and existing buildings can add more, plus units converted from storage or other non-living space.

Source: HCD, ADU Handbook

Fire sprinklers

New apartment buildings need automatic sprinklers throughout; NFPA 13R systems are allowed on buildings of four stories or fewer. New duplexes need residential sprinklers too.

Source: 2025 California Building Code, Chapter 9

Accessible units

Apartment buildings of three or more units must make ground-floor units adaptable and on an accessible route, or every unit when there is an elevator. Duplexes are not covered by these rules.

Source: 2025 California Building Code, Chapter 11A

2025 Energy Code

In effect since January 1, 2026. New multifamily buildings need rooftop solar sized to the roof, and water heating must be ready for heat pumps.

Source: California Energy Commission, 2025 Energy Code overview

FAQ

Multifamily construction FAQs

How much does it cost to build a duplex in Sacramento?

Our planning range for a 2,400 sq ft side-by-side duplex with standard finishes is $660k to $947k, including design, engineering and permits. Land, per-unit city fees and any frontage or utility upgrades are extra. It is a reference figure, not a quote; use the calculator on this page for your own size and finishes.

Can I build a duplex on my single-family lot under SB 9?

Often, yes. SB 9 lets most single-family lots in urban areas hold two homes, or be split into two lots with up to two homes each, approved without a public hearing. It does not apply to historic sites, some hazard areas, or where it would remove housing rented in the last three years, and a lot split needs an owner-occupancy affidavit. We check your parcel during pre-construction.

How much does it cost to build a fourplex in Sacramento?

Our planning range for a 4,000 sq ft fourplex with upgraded finishes, frontage and utility work is $1.27M to $2.05M, including design, engineering and permits. Land and per-unit city fees for water, sewer, parks and schools are extra. Use the calculator on this page for your own building.

How many units can I build on my lot?

It depends on the zoning, the lot size and the state laws that apply, such as SB 9 on many single-family lots and the ADU laws. We work out the legal maximum and the practical one, after parking, access and utilities, during pre-construction.

Do new apartment buildings need fire sprinklers?

Yes. New apartment buildings and new duplexes in California are built with automatic fire sprinklers, so they are in every budget we give you.

Do you build for investors and developers?

Yes. Most of our multifamily clients are owners and investors building to rent or sell. We price the design as it develops so the building still pencils when the plans are done.

Do you charge for feasibility?

The first call and a ballpark range are free. Feasibility, the site plan and a detailed budget are part of pre-construction, a flat fee credited toward the build if you go ahead with us.

How long does a small multifamily project take?

Plan on roughly 18 to 30 months from the first call to occupancy for a fourplex to 20-unit building, with design, planning review and permits taking about half of that. Duplexes are usually faster.

Sources: State Fire Marshal and HCD, Information Bulletin on residential sprinklers; State Allocation Board, 2026 developer fee adjustment. Page last updated .

Find out what your parcel can hold

Send us the address or APN. We will tell you how many units it can likely carry and what they are likely to cost to build.

Areas Served